FAQ
Answers before you ask.
Don’t see your question? Call (801) 440-2507.
29 questions
General
Don’t see yours? Call (801) 440-2507.
How long does a typical project take?
Small projects may take a few days, while larger builds or remodels can take several weeks. We always give you an estimated timeline in writing before any work starts, and we keep you updated if weather or inspections affect the schedule.
Is Diamond L Contracting licensed and insured?
Yes. Diamond L Contracting is a licensed Utah contractor (license #123331-5501) and is fully insured. We follow all local regulations and safety standards. You can verify any Utah contractor license on the DOPL license lookup.
Can you help with project planning, budgeting, and design?
Absolutely. We help with project planning, budgeting, and design so your vision becomes a reality while staying within budget and on schedule.
Do you handle permits?
Yes. We take care of all necessary permits and approvals so your project meets local building codes, and we schedule the city inspections for you.
What areas do you serve?
We're based in Eagle Mountain and serve Saratoga Springs, Lehi, and nearby communities in Utah County and southwest Salt Lake County. If you're not sure we cover your area, call (801) 440-2507.
Do you offer free estimates?
Yes, we offer free estimates. We visit the property, go over your goals and budget, and follow up with a written scope and price with no hidden fees.
Do you do both residential and commercial projects?
Yes. Diamond L Contracting is a general contractor for both homeowners and businesses. That includes custom homes, additions, basements, and remodels, plus commercial new construction, tenant improvements, and commercial remodels.
How long does it take to build a custom home?
Most custom homes take 6 to 12 months from groundbreaking to move-in, depending on size, complexity, and finishes. Permitting and design time come before that. You get a written schedule before construction starts, and we keep you updated as each phase passes inspection.
Do I need to own a lot before I start?
Not necessarily. We can help you find a lot and assess whether it's buildable, including access, slope, utilities, and setbacks, before you buy. If you already own land, we start with a site evaluation so there are no surprises once the foundation work begins.
What budget should I expect for a custom home?
Cost depends on size, design, site conditions, and the materials you choose. We give you transparent, itemized pricing and work within your budget, showing where you can save and where spending more is worth it, so the plan matches what you want to spend before anything is built.
How long does a home addition take?
Most home additions take 8 to 12 weeks of construction, depending on size and scope. Design and permit approval come first. We give you a written timeline before work starts and keep the rest of your home protected and livable throughout.
Will the addition match my existing home?
Yes. We match your home's existing siding, stucco, brick, or stone, plus rooflines, windows, and trim, so the addition looks like it was always part of the house. Inside, we carry flooring, cabinetry, and lighting through so the new space blends with the old.
Can you build second-story additions?
Yes. We build single-level and multi-story additions. A second story needs an engineer to confirm the existing foundation and framing can carry the load, and we coordinate that review, the plans, and the permits before construction starts.
What materials do you use for home additions?
We use wood framing, steel beams where spans require them, and reinforced concrete foundations. Insulation is spray foam or fiberglass batts with energy-efficient windows. Exterior and interior finishes are chosen to match your existing home.
How long does basement finishing take?
Most basement finishing projects take 6 to 10 weeks, depending on size and whether you're adding a bathroom or kitchen. We give you a written timeline before work starts, and inspections are scheduled as we go so the job doesn't stall.
Can you add a bathroom or kitchen to my basement?
Yes. We install the plumbing, electrical, and ventilation for full bathrooms, kitchenettes, and wet bars, so the basement works as a fully functional living space or a separate rental unit.
What design options do you offer for basements?
You choose the layout, flooring, lighting, cabinetry, and features. Popular options include luxury vinyl plank or tile flooring, recessed lighting, built-in shelving, wet bars, home theater wiring, and soundproofing between floors.
How long does a kitchen remodel take?
Most kitchen remodels take 4 to 8 weeks, depending on scope. Moving plumbing or walls, or waiting on custom cabinets, adds time. We order long-lead items before demolition so your kitchen is out of service for as short a time as possible.
Can you help with kitchen design ideas?
Yes. We provide design guidance and 3D renderings so you can see the layout, cabinets, and finishes before anything is ordered, and we help you balance looks, function, and budget.
Do you offer custom cabinetry and storage?
Yes. We install custom and semi-custom cabinets in solid wood, MDF, or frameless European styles, along with pantry organization and other storage that makes the most of your space.
How long does a bathroom remodel take?
Most bathroom remodels take 2 to 6 weeks, depending on scope. A fixture and vanity update is on the short end, and a full remodel with new tile and a moved shower is on the long end. You get a written timeline before demolition starts.
Can you help with a small bathroom?
Yes. We specialize in getting the most out of small bathrooms with smart storage, the right-sized fixtures, and layouts that make the room feel bigger, such as a curbless walk-in shower in place of a tub.
Do you offer accessibility upgrades?
Yes. We build ADA-compliant bathrooms, including walk-in and curbless showers, grab bars, comfort-height toilets, and wider doorways, for aging in place or for family members with limited mobility.
What is an accessory dwelling unit (ADU)?
An ADU is a secondary, self-contained living space on the same lot as an existing home. It can be attached, detached, or converted from an existing space like a garage or basement. ADUs are used for guest housing, rental income, or private living space for family members.
How long does it take to build an ADU?
Most ADU projects take 4 to 8 months from initial planning to final inspection. The timeline depends on size, design, and the city's permitting process. Converting an existing basement or garage is usually faster than building a detached unit.
Do I need a permit to build an ADU?
Yes. Permits are required for ADU construction. We handle the permit applications and work with your city's building department so the unit meets zoning and building code requirements.
Can you build both attached and detached ADUs?
Yes. We build detached ADUs as separate structures and attached ADUs connected to the main home, depending on your property, your goals, and what your city allows.
How big can my ADU be?
Allowed size depends on your city's zoning rules. Most ADUs fall between 400 and 1,200 square feet. We check your lot and local requirements early and help design a unit that makes the most of the space you're allowed.
Can the ADU match my home?
Yes. We design ADUs to complement your existing home's style and architecture, with matching siding, roofing, and trim, so the new unit looks like it belongs on the property.
1 questions
Commercial projects
Do you work with our architect, or can you help with design?
Both. We collaborate with architects, designers, and engineers and build from their plans. If you're starting with an idea instead of drawings, we help with planning, layout, and design and bring in the right designer to finish the plans.
